We Manufacture Reinforcement Cages for Cast-in-Place Bored Piles According to DIN EN 1536

Production is carried out in compliance with DIN 488-2009, EN-ISO-17660, and following the guidelines of ZTV-Ing. We flexibly adapt to your requirements and can also manufacture suitable reinforcement cages for the SOB (Continuous Flight Auger) and VDW (Cased Bored Pile) methods.

We offer conical reinforcement cages with or without vibration blades, off-center reinforcement cages within the borehole, as well as cage-in-cage solutions. Additionally, we provide delivery and installation of accessories such as inclinometer pipes.

We supply reinforcement cages in your desired lengths. For lengths between 18 m and over 25 m, we rely on a trusted freight company with extendable semi-trailers. Whether it’s projects exceeding 500 tons or small-scale construction ventures, we guarantee execution at the highest technical standard.

Technical Specifications

  • Cage diameter: 200 mm [300 mm] to 2000 mm

  • Cage lengths: up to 20.00 m without requiring a reinforcement splice

  • Longitudinal bar diameter: 16 mm to 40 mm

  • Integration of cranked and bent longitudinal reinforcement bars

  • Helical reinforcement dimensions: 8 mm to 16 mm

  • Various pitch heights per cage

  • Different bar diameters

  • Double helical reinforcement also available

  • Multilayer Longitudinal Reinforcement

References of Bored Piles

Q6 Q7 Das Quartier

Mannheim – 2013 to 2016 – 100 Tons

A8 Enztalquerung

Pforzheim – 2021 to 2024 – 110 Tons

Baugrube Uni Mannheim

Mannheim – 2023 to 2024 – 80 Tons

Zeiss Wetzlar Pfähle

Wetzlar – 2023 – 896 Tons

EÜ Obernhof

Obernhof – 2023 – 110 Tons

Umschlagbahnhof Karlsruhe, Mast

Karlsruhe – 2021 – 74 Tons

B293 Lärmschutzwand

Leingarten – 2022 – 44 Tons

P7 Hauptbahnhof, Mannheim

Mannheim – 2021 – 49 Tons

Karlstein 380 kV-Umspannanlage

Dettingen – 2022 to 2023 – 161 Tons

ARGE FAIR Baugrube Nord

Frankfurt – 2017 to 2018 – 2.528 Tons