Manufacturing Reinforcement According to Your Design Specifications and DIN Standards
Using state-of-the-art machinery, modern control and production software, and an efficient logistics concept, we ensure short processing times and fast on-site deliveries. Special loading control systems minimize errors to the lowest possible level.
Our modern crane systems and direct rail connections enable efficient material storage and ensure smooth loading operations. Material supply is handled via rail, truck, or inland shipping.
References of Structural and Civil Engineering
Regionaltangente West
Frankfurt – 2024 to 2025 – 870 Tons
Filstalbrücke
Mühlhausen – 2014 to 2021- 9.000 Tons
Zebra Europaallee
Frankfurt – 2019 to 2021- 3.000 Tons
Omniturm
Frankfurt – 2017 to 2018 – 5.874 Tons
Hochhaus 99 West
Frankfurt – 2019 to 2021- x Tons
A8 Enztalquerung
Pforzheim – 2021 to 2024 – 4.000 Tons
Loksite
Mannheim – 2020 to 2022 – 4.000 Tons
FOUR Kellerkasten
Frankfurt – 2021 to 2024 – 34.600 Tons
Hafenparkquartier
Frankfurt – 2021 to 2024 – 8.910 Tons